Results of scientific campaigns

Each year, scientific team meets at the site of the Moutiere at 2100 m altitude to test in a situation all the technical parameters prepared and discussed throughout the year and put them to the test experience and natural elements.

View-to-ballast - 1024 x 200

Results of previous campaigns

Results 2012

Progress of the project in summer 2012 Jean-Paul Rochaix has installed the carrier cable of the focal carrycot. 800 m long, this cable is now equipped with a secure replacement of the initial manual winch, electric winch which facilitates the operations...

Results 2013

Progress of the project and 2013 The summer was 2013 dedicated to -the reliability of the system and improvement of installation and adjustment steps that are better controlled and occur more quickly; -the planning of many developments to...